• Live Radio
  • Videos
  • About
  • Contact
  • Despite Media
Ghana Election 2020
  • Home
  • Local News
  • Politics
  • Showbiz
  • Sports
  • Business
  • Opinion
  • VIDEOS
  • Media
    • Videos
    • Audio
    • Live Radio
    • Photos
  • Election 2020
Local News
 
 
 
Home Business Industry & Manufacturing 201105

VRA States Position On VALCO

20-May-2011
/ Industry & Manufacturing, Business
Email
Print
Comments 0
(0)
Comments
Share on Facebook Share on Twitter
 

The Chief Executive of Volta River Authority (VRA), Kweku A. Awotwi, says the Authority expects there will be additional electricity capacity to increase its supply of power to Volta Aluminium Company (VALCO) from the current 70 megawatts (MW) to 140 MW at the end of this year, 2011.

He explained that VRA’s power-generation system currently does not have the capacity to supply additional power of 70 MW to VALCO to enable it to operate a second pot line.

“Today, the system is in a fine balance, and any attempt to increase supply of power to VALCO is likely to create instability, leading to possible power trips system-wide. The reason that the system cannot provide additional power today is twofold: first, that forecast capacity for 2011 is unavailable, and in particular, the Takoradi steam unit has gone on repairs after a system-side trip late last year; and second, that the demand for power by Ghanaians has sharply shot up. There is basically no surplus”.

Mr. Awotwi said it is not true the impression being created that VRA is not willing to provide VALCO with the much needed additional power. “The idea of re-starting VALCO as a prelude to developing an integrated aluminium project in the long-term is laudable. To successfully achieve it, however, requires a dispassionate evaluation of the costs and benefits of achieving those goals. What are the cost and benefits of these efforts? Do the benefits pay for, and outweigh the costs? And who pays for these costs on the way to enjoying the promised benefits?”

Challenges

Providing some statistics to support the claim Mr. Awotwi stated: “Ghana Grid Company (GRIDCo) projected a 2011 peak demand for power at 1,589 MW, a level typically reached during November/December. However, peak demand in 2011 has already hit 1660 MW, just five months into the year. At this rate of growth, you can imagine what the demand will be by the end of the year.”

He also stated that supporting VALCO’s current power needs reduced the amount of reserve capacity available to the system, required to provide back-up capacity and maintain system reliability anytime there was a contingency – whether for unexpected power outages or for scheduled maintenance.

Mr. Awotwi, who was speaking to B&FT in an interview, said “Until VRA starts operating its steam unit to produce an additional 100 MW, and increases Takoradi’s current power generation from 200 to 300 MW, it will be difficult to meet VALCO’s additional demand in 2011”.

He pointed out a few important outcomes of operating VALCO at the current time. First, the Authority was forced to cut back on exports of power to neighbouring countries such as Togo and Benin, and would lose between US$10-$15 million per potline of VALCO operation.

Second, the VRA was being forced to operate its high cost diesel-powered plants during peak periods, at a cost – of 30 US c/kWh – of several multiples of the tariff being received from VALCO. These factors combined to weaken VRA’s financial position, and VRA hoped that it would be compensated properly for these losses by the Government of Ghana and/or VALCO.

Supply Plan

VRA has a number of projects in the supply pipeline, Mr. Awotwi revealed. This plan includes the completion of another plant at Aboadze to add 132 MW to existing capacity by the end of 2011, and the relocation of the two 110 MW generating units to the Western Region – to be ready by 2013/2014, using gas from Ghana’s gas fields.

VALCO Operation

VALCO since its re-activation almost four months ago has been operating at 20 percent capacity and it is currently producing 3,000 metric tonnes of foundry ingots per month for local and international markets.

Officials of the aluminium smelter say the business can only be sustainable given its huge overheads, if it gets additional supply of power to operate a second potline.

Consequently, VALCO wants VRA to increase its power supply to enable it to operate a second potline which will increase its production from 3,000 metric tonnes to more than 6,000 metric tonnes by middle of the year.

VALCO was established by the late Dr. Kwame Nkrumah, Ghana’a first President with the aim of creating an integrated aluminium project creating a value chain comprising bauxite, aluminium smelter, and a refinery.

Source: B&FT

 

 
 

 

Comments ( 0 ): Post Your Comments >>

Disclaimer: Opinions expressed here are those of the writers and do not reflect those of Peacefmonline.com. Peacefmonline.com accepts no responsibility legal or otherwise for their accuracy of content. Please report any inappropriate content to us, and we will evaluate it as a matter of priority.
Featured Video
Previous Post

Newmont Ghana Announces Appointment Of Regional Vice Prez – African Operations

Next Post

Mobile Wallet Offered To UK Shoppers

 
 

More Stories

Star Beer Shines With Asanteman, Begins Production In Kumasi Again
Tesla Extends Price Cuts To U.S., Europe To Drive Demand
Tesla Suspends Production At Shanghai Plant
UPPR Ghana Ltd Wins CIMG Manufacturing Company Of The Year
Shoe Fabriek, Ghana’s Largest Manufacturer Of Safety Boots Marks 1st Anniversary
Toyota To Suspend Production At 3 Western Japan Plants As Typhoon Nears
Mohinani Group Set to Open First Bottle-To-Bottle rPET Plant in Ghana
Ghana Gas Lauded For Contribution Towards Govt’s Industrialisation Agenda
Tropical Cable Readies To Celebrate 25 Years As A Leading Electrical Cable Manufacturer
Next Post

Mobile Wallet Offered To UK Shoppers

  Ghana Business News

  • General News
  • Economy
  • Banking & Finance
  • Stock Market
  • Industry/Manufacturing


 
 

Other Industry & Manufacturing Stories

  • Star Beer Shines With Asanteman, Begins Production In Kumasi Again

  • Tesla Extends Price Cuts To U.S., Europe To Drive Demand

  • Tesla Suspends Production At Shanghai Plant

  • UPPR Ghana Ltd Wins CIMG Manufacturing Company Of The Year

  • Shoe Fabriek, Ghana’s Largest Manufacturer Of Safety Boots Marks 1st Anniversary

  • Toyota To Suspend Production At 3 Western Japan Plants As Typhoon Nears

  • Mohinani Group Set to Open First Bottle-To-Bottle rPET Plant in Ghana

  • Ghana Gas Lauded For Contribution Towards Govt’s Industrialisation Agenda

  • Tropical Cable Readies To Celebrate 25 Years As A Leading Electrical Cable Manufacturer

  • Toyota To Cut Global Production Plan By 100,000 In June

 

 
 

Popular Videos

Kokrokoo Discussion Segment On Peace 104.3 FM (23/03/2023)

Kokrokoo Discussion Segment On Peace 104.3 FM (22/03/2023)

Peace Power Sports (23/03/2023)

Peace Power Sports (22/03/2023)

Akan News @ Midday On Peace 104.3 FM (22/03/2023)

Kokrokoo Discussion Segment On Peace 104.3 FM (22/03/2023)

Peace FM Online and Despite Media

peacefmonline.com offers its reading audience with a comprehensive online source for up-to-the-minute news about politics, business, entertainment and other issues in Ghana

Follow us on social media:

Category

  • Home
  • Local News
  • Politics
  • Showbiz
  • Sports
  • Business
  • Opinion
  • Trivia
  • Foreign
  • Audio
  • Photos
  • Videos
  • Elections
Decision Time
Ghana Election 2020 2016 Elections
Services
Live Radio Audio on Demand Ghana Elections Advertise with Us
Useful Links
Despite Media About Us Contact Us Feedback Form Terms and Conditions Privacy
Our Brands
Despite Media UTV Peace FM Okay FM Hello FM Neat FM Peacefmonline
  • About
  • Advertise
  • Terms & Conditions
  • Contact
  • Privacy

© 2020 Peacefmonline.com - An online portal owned and managed by Despite Media

  • Home
  • Local News
  • Politics
  • Showbiz
  • Sports
  • Business
  • Articles
  • Trivia
  • Foreign
  • Live Radio
  • Photos
  • Videos
  • Audio
  • Election 2020

© 2020 Peacefmonline.com - An online portal owned and managed by Despite Media